The Villages – Phase II

Detail Plumbing participated in the comprehensive execution of the plumbing systems for The Villages – Phase II, a multifamily residential development located in Liberty City, Miami. The project encompasses a residential building with approximately 120 units, including the complete installation of sanitary, domestic water, and HVAC condensate systems, as well as the supply and installation of all plumbing fixtures.

Due to its scale, duration, and required level of multi-trade coordination, this project stands as a major milestone within Detail Plumbing’s multifamily portfolio. It demonstrates the company’s capability to execute high-volume projects with strict technical control, regulatory compliance, and seamless coordination with the general contractor and overlapping disciplines.

Project type

Residential / Multifamily

General contractor

Rinaldi Group

Location

890 NW 69th Street, Miami, Florida 33150

Execution period

2023 – 2025

  • Complete installation of the sanitary drainage system for a high-density multifamily residential building.

  • Installation of domestic water networks for both cold and hot water distribution.

  • Installation of HVAC condensate drain networks according to approved engineering plans and technical specifications.

  • Coordination of vertical risers and horizontal distribution branches across common areas, residential units, and utility shafts.

  • Full fixture installation and trim-out inside the residential units and designated service areas.

  • Technical multi-trade coordination utilizing Building Information Modeling (BIM) to proactively mitigate physical interferences with structural, HVAC, and electrical systems.

  • Continuous technical support during municipal inspections, pressure testing, and compliance documentation.

  • Complex vertical and horizontal layout coordination of extensive piping networks across a multi-unit residential building.

  • Design and management of critical access points to streamline future system maintenance.

  • Prevention of structural noise, water hammer, and vibration transmissions within the installed systems.

  • Seamless integration of sanitary, domestic water, and condensate networks with overlapping mechanical, electrical, and structural trades.

  • Rigorous management of multi-phase municipal inspections and strict building code compliance throughout the execution period.

  • Maintaining stringent quality control over repetitive, high-volume unit installations.

Detail Plumbing deployed a robust technical coordination strategy grounded in detailed pre-construction planning, clash detection, and continuous on-site field supervision. Leveraging BIM coordination allowed the team to anticipate structural conflicts, optimize pipe routing, and streamline the installation of vertical risers and horizontal distribution networks.

The field team applied strategic installation criteria focused on long-term serviceability, utilizing high-performance, extended-lifespan materials. Additionally, disciplined jobsite waste management practices contributed to a cleaner, safer, and more efficient workflow, effectively reducing the environmental footprint during the construction process.

The project was successfully executed, delivering a strong technical performance that exceeded expectations. Construction progressed seamlessly without any major delays attributable to the plumbing scope, maintaining field momentum, regulatory compliance, and collaborative communication with the general contractor.

Detail Plumbing’s performance on this project reinforces its proven expertise in large-scale multifamily residential developments, demonstrating its capacity to deliver consistent, high-quality execution across multiple units under demanding technical schedules.