Chick Fil A

Chick-Fil-A
This commercial kitchen renovation project involved extensive plumbing upgrades to ensure sanitary compliance in a highly confined space.
Our team coordinated with multiple trades to execute the work efficiently, managing demolition, pipe installation, fixture connections, and ADA-compliant bathroom conversions without disrupting the ongoing operations of the business.
This project highlights our expertise in construction in confined spaces and our commitment to multidisciplinary coordination for seamless delivery.
Location
Miami Dade College 11011 SW 104th Street Miami 33176
Client
Lebolo Construction Management
Project Type
Comercial
Execution Year
2023

Project Scope
This commercial project required a complete plumbing overhaul of a high-traffic restaurant kitchen and adjacent bathroom facilities. The scope included the demolition and replacement of existing sanitary lines, installation of new water and drain systems, grease interceptor integration, and full ADA-compliant restroom renovations.
Work was executed in a compact site with limited access, requiring precise scheduling and close coordination with other trades. Our role also included plan review and code compliance verification to ensure all installations met health and safety regulations.
Technical Challenges of the Project

Smart Planning in Complex Environments
- Maintaining operations during execution in a high-traffic kitchen required a phased installation and night shifts.
- Confined areas and limited access demanded precise planning and close coordination with other trades.
- Drain redesign and compliance were achieved with accurate slope calibration and expert integration of new piping systems.
Solutions Provided by Detail
- Designed and implemented a low-maintenance drainage system with integrated odor control to meet high-hygiene kitchen standards.
- Coordinated phased construction work to allow uninterrupted kitchen operations during the remodel.
- Carefully routed pipes to ensure future maintenance access without structural disruption.
Final Result
The commercial kitchen’s plumbing system was fully upgraded, meeting Florida’s rigorous health and safety standards. With modern, high-durability pipelines and a design focused on long-term performance, the installation passed all inspections and began operating smoothly from day one. The client now benefits from a reliable, obstruction-free plumbing system tailored to the demands of a high-traffic food service environment.

Similar Institutional Projects
Project Types
We adapt our work to meet the unique demands of each project type.

Institutional
Precision and clear regulations.
Clean, coordinated installations that meet the highest technical standards.
View more

Residential
Operational without delays.
Functional, clean installations, ready for immediate use.
View more
Public
Solutions for limited spaces.
Precise execution, respecting interior design and visible areas.
View more

Industrial
Confidence in critical environments.
Secure installations, ready for audits and inspections.
View more

Luxury
Details that make the difference.
Impeccable execution, discreet techniques, and finishes that meet the project's high standards.
View more

Plumbing solutions tailored to your project.
We design and execute high-performance plumbing systems that adapt to the specific needs of each construction. Whether residential, commercial, or industrial, our solutions ensure regulatory compliance, flawless coordination, and results that elevate the value of your work.
Sitemap




